Civil Construction — NOVARISE
01Civil & Structural

Civil Construction

Foundations, structural concrete, industrial buildings and site infrastructure for the Kingdom's most demanding sites.

Live capability
0M+
Safe Man-hours
0+
Civil Projects
0+
Active Sites
0K m³
Concrete Poured
Civil Construction — Overview
01Overview
On-site capability
Civil Construction
Overview

Foundations, structural concrete, industrial buildings and site infrastructure for the Kingdom's most demanding sites.

From greenfield refinery plots to brownfield expansions inside live SABIC plants, our civil teams deliver concrete, rebar, structural steel and site works to QA/QC standards pre-cleared by Saudi Aramco, SABIC, Ma'aden and the major EPC contractors operating across the Kingdom.

Single accountable partner
QA/QC documentation pre-cleared
Self-performed crews & equipment
24/7 dispatch & field support
What We Do

Inside our civil construction scope.

Heavy Foundations & Piling

Pile caps, raft foundations and deep foundations for industrial loads.

Structural Concrete

Formwork, rebar fixing and high-grade concrete pours to ACI / ASTM specs.

Steel Structure Erection

Pre-engineered buildings, pipe racks and process structures.

Industrial Buildings

Warehouses, workshops, control rooms and substation buildings.

Roads, Paving & Grading

Site preparation, asphalt, kerbing and internal plant roads.

Drainage & Underground Utilities

Storm drainage, sewerage and underground service corridors.

Capability snapshot

Civil delivery capability

The numbers behind the scope — owned resources, certifications and standards we deliver against on every civil construction engagement.

Request a detailed capability statement
Concrete capacity / dayUp to 1,200 m³
Owned formwork systemsPERI / Doka equivalent
Tower cranes deployable6 (50T–80T)
QA/QC standardsACI, ASTM, SAES-Q-001
Concurrent active sitesUp to 12
Mobilization window14–21 days
Reference Projects

Recent civil construction we've delivered.

Refinery Tank Farm Foundations
2024Delivered

Refinery Tank Farm Foundations

EPC for Saudi Aramco

12,000 m³ structural concrete + piling

Petrochemical Process Building
2023Delivered

Petrochemical Process Building

SABIC affiliate

Steel structure erection, 4,200 T

Industrial Warehouse Complex
2023Delivered

Industrial Warehouse Complex

Private developer, Jubail

32,000 m² PEB + civil

How We Engage

From inquiry to handover. No hand-offs.

01

Inquiry & Site Survey

BOQ review, joint site walk-down and constraint mapping with the client engineering team.

02

Method Statement & Approvals

MS, ITP and HSE plan submission for client / EPC approval before mobilization.

03

Mobilization

Crews, equipment and site facilities mobilized to schedule with full QA/QC documentation.

04

Execution & Handover

Daily progress reporting, third-party inspection and snag-free handover with as-built documentation.

Standards & Approvals

Pre-cleared for the Kingdom's most demanding clients.

ISO 9001:2015
ISO 45001 (OHS)
Saudi Aramco SAES-Q-001
SABIC SES Civil
Royal Commission (RCJY)
FAQ

Questions clients ask before signing.

Don't see your question? Our commercial team usually replies within one business day.

Ask a question

Yes. Our crews are trained on permit-to-work systems used by Aramco, SABIC and Ma'aden, including hot-work, confined-space and isolation procedures required for brownfield work.

Standard mobilization is 14–21 days for medium-size scopes. Emergency or shutdown support can be mobilized within 96 hours from existing fleet and crews.

Concrete, rebar, formwork and structural steel erection are self-performed by our owned crews. Specialty scopes such as post-tensioning are delivered with audited specialist partners.

ACI 318, ASTM, BS EN, plus client-specific standards including SAES-Q-001 (Aramco), SABIC SES and Royal Commission specifications for Jubail and Yanbu.

Related Services

Explore our other verticals.

NOVARISE leadership reviewing project blueprints
Let's Build Together

Have a project
that demands excellence?

Submit an RFQ, request our capability statement, or schedule a consultation with our project leadership team.